Materials Previously Review during DCE BOOT Code Walk-Thru Telecons
Agenda for Thursday, October 19th: 10AM - 2:30PM MDT
All day Review of DCE BOOT Code (v1.04)
Continue from where previous days session ended -
Done
Complete Review of entire Code package. -
Done
Agenda for Wednesday, October 18th: 10AM - 4PM MDT
All day Review of DCE BOOT Code (v1.04)
Starting with Tasks called by BOOT_MAIN_EXECUTIVE -
Done
Agenda for Tuesday, October 10th - 10:00AM MDT
BOOT Code Review Process
Discuss options for multi-day Review -
Done
Discuss time-table for completing BOOT Code -
Done
BOOT Main Routine (v.1.02 of Code)
INIT_CRC (Lines: 3189 - 3249) -
Done
CLEAR_OLD_CRCS (Lines: 3344 - 3375) -
Done
BOOT Main Executive Routine
BOOT_MAIN_EXECUTIVE (Lines: 865 - 977) -
Done
Agenda for Thursday, October 5th - 11:00AM MDT
BOOT Code Action Items
Report on Closed & Pending AI's -
Done
Report on Status of OPEN AI's from the Asignees -
Done
Report on Previous DCE FSW AI's that pertain to BOOT -
Done
Agenda for Tuesday, October 3rd - 10:00AM MDT
BOOT Main Routine (v.1.02 of Code)
BOOT_MAIN (Lines: 768 - 862) -
Done
DISABLE_DOG (Lines: 2170 - 2186) -
Done
ENABLE_DOG -
Done
SAFE_CONTROLS (Lines: 2725 - 2754) -
Done
INIT_RAM (Lines: 2758 - 2827) -
Done
CLEAR_RAM -
Done
REPORT_DIAGNOSTIC (Lines: 2924 - 3064) -
Done
COPY_PATCHABLE (Lines: 2862 - 2920) -
Done
MEM_COPY -
Done
Report from UCB on their timeline for transitioning to BOOT Code v1.02
Status of OPERATE Code updates needed to support new BOOT/OPERATE scheme - (Daniel)
Daniel Reports that OPERATE Code supports new BOOT Code architecture.
Status of GSE/Lab modifications required to support new BOOT/OPERATE scheme - (Daniel)
Daniel Reports that GSE Environment supports new BOOT Code architecture.
Agenda for Thursday, September 28th - 11:00AM MDT
No Meeting - DCE BOOT Code Testing at UCB -
Done
Agenda for Tuesday, September 26th - 11:00AM MDT
BOOT Setup and ISR's (v.1.00 of Code)
ALLOCATE INTERNAL 8051 RAM -
Done
BOOT-TO-OPERATE ICD -
Done
BOOT RESET VECTOR AND INTERRUPT SERVICE ROUTINE VECTORS -
Done
BOOT MODE INTERRUPT SERVICE ROUTINES (ISRS) -
Done
BOOT-MODE ISR SUPPORT ROUTINES -
Done
Agenda for Thursday, September 21st - 11:00AM MDT
Review BOOT/OPERATE Interface Specification -
Done
Code Package Overview -
Done
Highlight differences from previous design -
Done
Highlight TBD's within the existing code -
Done
Organize Review Schedule for coming week -
Done
Return to COS Instrument Development
Mail comments to
Ken.Brownsberger@Colorado.EDU